Retour sommaire principal

logoperso.jpg (28315 octets)

Seuls les textes en francais font foi. Only french textes are reliable.


SOMMAIRE: MFUNO11 Gamme de montage de la structure du parachute. / Recovery system structure mounting instructions.
Edition 04/01


I  Installation de la boite parachute / Parachute box installation

GABARIT DE DECOUPE / CUT-OUT JIG.[mise à jour 05/03/01]

DECOUPE DU DOS DE FUSELAGE / FUSELAGE SKIN CUT-OUT.

ASSEMBLAGE DES DEUX BOITES / BOX ASSEMBLIES.

PREPARATION DU FOND DE COFFRE / LUGGAGE COMPARTMENT FRAME PREPARATION.

PREPARATION COLLAGE / BONDING PREPARATION.[maj 01/09/2002]

COLLAGE / BONDING.

FINITION / FINISHING.


II Stratification des points d'attache de sangles avant / Front attachment point lay-up.

LOCALISATION DE L'AXE DES POINTS D'ATTACHE AVANT / FRONT ATTACHMENT POINT LOCATION.

MONTAGE A BLANC DU SANDWICH CARBONE-ALUMINIUM / MOK ASSEMBLY OF CARBON FIBER/ALUMINIUM SANDWICH.

PRINCIPE ET MISE EN OEUVRE DE LA STRATIFICATION / LAY UP METHOD AND REALISATION